Selasa, 20 November 2018

Technology Of LRT

Technology is all a means to provide goods needed for recreation and human life. The use of technology by humans by converting natural resources into simple tools. The longer the technology will grow, one example of modern technology in Indonesia is the LRT Project.



The light rail transit Jabodebek project or abbreviated as LRT Jabodebek is a light rail transport (LRT) system that will be built in Jakarta, Indonesia and connects Jakarta with cities such as Bekasi and Bogor. There are 2 initiators of LRT in Jakarta, the DKI Provincial Government will build an LRT in a city called the Jakarta LRT and PT Adhi Karya which will build an LRT that connects Jakarta with the surrounding cities under the name LRT Jabodebek.

The plan, construction of LRT with a total length of 83.6 km will be carried out in two stages. The first phase includes cross-service Cibubur-Cawang, East Bekasi-Cawang, Cawang-Dukuh Atas with 18 stations and 42.1 km of lines. 
Phase two will serve across the Cibubur-Bogor services, Upper Dukuh-Palmerah-Senayan, and Palmerah-Grogol with a length of 41.5 km. A light train will be made with a configuration of 6 train lines that can carry 24,000 road PPHD heads 2 minutes at peak time. With an operating speed of 60-80 km per hour. For power supply, the LRT train will use DC power of 15,000 V. While the infrastructure structure, the pile foundation is 100 cm and 80 cm in diameter, where the pillars and girder of precast and prestress concrete.




Tidak ada komentar:

Posting Komentar